The Construction Research Programme – Project Showcase
This is an archive version of an article from the CPIc website, which was closed in 2025. CPIc (the Construction Project Information Committee) was formed from representatives of the major industry institutions and was responsible for providing best practice guidance on the content, form and preparation of construction production information. |
The AVANTI programme was one of the two ‘programmes’ of activity selected for funding by DTI in 2002. The introduction of larger areas of development – aiming to become self-funding, ongoing networks – was a response to the recommendations made by Sir John Fairclough in Rethinking Construction Research and Innovation (see Chapter 1).
The Avanti initiative was led by Collaborating for the Built Environment (Be) in partnership with Teamwork and IAI. The group identified a need to reduce the risks involved in adoption of new methods of working, bringing together areas of current best-practice (such as CPIC protocols) that had previously gained too little market penetration to have significant impact on the sector.
The objective was to deliver improved project and business performance through the use of ICT to support collaborative working, applying the AVANTI approach by getting people to work together; providing processes to enable collaboration; and applying tools to support collaborative working.
The Avanti approach increases the quality of information, the predictability of outcomes and by reducing risk and waste. Avanti is not an IT system or tool. As a method or approach, Avanti can be applied to projects using 2D CAD as well as those using 3D intelligent modelling or building information models. It is supported by handbooks, toolkits and on-site mentoring.
The core of the Avanti method is an approach where all CAD information is generated with the same origin, orientation and scale, and organised in layers that can be shared. All layers and CAD model files are named consistently within a specific Avanti convention to allow others to find the relevant CAD data.
Avanti achieves its core objective in three ways; through providing consultants, each an expert in the Avanti approach; Information standards and procedures; and cross-project assessment and measurement.
Posted on February 15, 2007
Featured articles and news
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Digital technology, transformation and cybersecurity
Supporting SMEs through Digitalisation in Construction.
Villa Wolf in Gubin, history and reconstruction. Book review.
Construction contract awards down one billion pounds
Decline over the past two months compared to the same period last year, follows the positive start to the year.
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.